Driveway -Week 3

Progress was slow this week, mainly due to the rain and the cold weather. With temperatures struggling to get above zero for a lot of the time, the concrete spent more timing freezing than setting. The border of the driveway has been now been completed on three sides, the wall has been rebuilt and a lot of tidying up of the site has been done.

This image has an empty alt attribute; its file name is img_20210123_132003294.jpg

Leave a comment